An undersea power line connecting the large island of Evia with the smaller Sporades isle of Skiathos, to its north, was officially inaugurated on Monday at a high-voltage sub-station on the former.
According to the Independent Power Transmission Operator (IPTO or ADMIE) the project includes 29-km submarine cable, a 30-km overland transfer line on Evia, a new gas insulated sub-station (GIS) on Skiathos and upgrades of the current high-voltage infrastructure in northern Evia, Greece’s second largest island.
































![Xbox: Πρόκληση για την νέα CEO της Microsoft Gaming η τιμή του Game Pass [γράφημα]](https://www.ot.gr/wp-content/uploads/2024/01/XBOX.png)





